WhatsApp Image 2022-12-26 at 3.05.38 PM.jpeg

Control System Retrofit

Periode : May 2016 - December 2016

Location : Natuna Sea

Gas Turbine Control System Upgrade from PLC-5 to RSLogix 5000 of :

  • 2 Units Rolls Royce Compressor Package

  • Units Solar Gas Turbine Generator Package

Periode : May 2016 - July 2016, July 2016 - September 2016, October 2015

Location : Kangean Energy Pagerungan Island

  • Upgrade HMI for Solar Turbine Saturn 20 Genset to FTView 25

  • Provide hardware and software

  • Installation, Start up Commissioning

Periode : January 2015 - March 2015

Location : ConocoPhillips Sumatera

  • Retrofit/Upgrade 2 Units Solar Saturn 20 Genset from PLC5 to Control Logix 5000

  • VAR Load sharing improvement

  • HMI Development

Periode :August 2015 - September 2015

Location : Grissik, Sumatera Island

  • Configure CGCM Module Solar Turbine Genset

  • Replace and Configure AVR

Periode : June 2012

Location : Serdang South Sumatera

  • Retrofit Control System Superior Gas Engine Compressor Set

Periode : March 2011 - May 2011

Location : South Sumatera

  • Supervision of Engineering Provide Control System Engineer to perform PLC upgrade gas turbine control

  • Engineering Services for 2 (two) HMI for 2(two) Solar Gas Turbine Compressor set and 1 (one) Process Control

Periode : September 2009 - November 2009

Location : Rawa Field South Sumatera

  • Rawa LP Compressor PK 108 Control Retrofit

  • Provide Engineer to design, rebuilt, installation/construction, start up

Periode : December 2007 - Febuary 2008

Location : Udang "A" Natuna Sea

  • PLC Programming, MMI upgrade on production process control

Periode : July 2005 - September 2005

Location : Serdang South Sumatera

  • Retrofit 4 Unit Superior Reciprocating Gas Compressor Control System from Amot Pneumatic to PLC Control System 