Control System Retrofit
Periode : May 2016 - December 2016
Location : Natuna Sea
Gas Turbine Control System Upgrade from PLC-5 to RSLogix 5000 of :
-
2 Units Rolls Royce Compressor Package
-
Units Solar Gas Turbine Generator Package
Periode : May 2016 - July 2016, July 2016 - September 2016, October 2015
Location : Kangean Energy Pagerungan Island
-
Upgrade HMI for Solar Turbine Saturn 20 Genset to FTView 25
-
Provide hardware and software
-
Installation, Start up Commissioning
Periode : January 2015 - March 2015
Location : ConocoPhillips Sumatera
-
Retrofit/Upgrade 2 Units Solar Saturn 20 Genset from PLC5 to Control Logix 5000
-
VAR Load sharing improvement
-
HMI Development
Periode :August 2015 - September 2015
Location : Grissik, Sumatera Island
-
Configure CGCM Module Solar Turbine Genset
-
Replace and Configure AVR
Periode : June 2012
Location : Serdang South Sumatera
-
Retrofit Control System Superior Gas Engine Compressor Set
Periode : March 2011 - May 2011
Location : South Sumatera
-
Supervision of Engineering Provide Control System Engineer to perform PLC upgrade gas turbine control
-
Engineering Services for 2 (two) HMI for 2(two) Solar Gas Turbine Compressor set and 1 (one) Process Control
Periode : September 2009 - November 2009
Location : Rawa Field South Sumatera
-
Rawa LP Compressor PK 108 Control Retrofit
-
Provide Engineer to design, rebuilt, installation/construction, start up
Periode : December 2007 - Febuary 2008
Location : Udang "A" Natuna Sea
-
PLC Programming, MMI upgrade on production process control
Periode : July 2005 - September 2005
Location : Serdang South Sumatera
-
Retrofit 4 Unit Superior Reciprocating Gas Compressor Control System from Amot Pneumatic to PLC Control System